This standard specifies the methods, technical requirements and acceptance criteria of primary loop hydraulic tests in a pressurized water reactor (PWR) nuclear power plant, to ensure integrity of the pressure boundary in primary loop, and that equipment manufacturing quality and installation quality satisfy the requirements for long-term stable operation of the unit as well as nuclear safety regulations.
This standard is applicable to the primary loop hydraulic tests of initial start-up commissioning phase of in a PWR nuclear power plant.